Thread: Oyster PAYG
View Single Post
  #14   Report Post  
Old March 8th 10, 05:34 PM posted to uk.transport.london
Sky Rider[_2_] Sky Rider[_2_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 7
Default Oyster PAYG

On Mar 8, 12:03*pm, Mizter T wrote:

I haven't yet been to Wimbledon since the new arrangements took effect
at the beginning of January, but yes, a passenger would need to touch-
in at Wimbledon before starting an NR journey if they've arrived on a
tram.

If they're finishing an NR journey at Wimbledon then you probably need
to touch-out to finish that journey before then touching-in again on
the Tramlink platform to cover your tram journey. I guess it's
possible that things have been configured so as to permit a single
touch on the Tramlink validator to both end the NR journey and start
the tram journey, but without having tried it (or been to Wimbledon
and seen whatever instruction notices are on display) then I couldn't
possibly say whether that's the case or not.


There are 4 validators on the Tram/FCC island platform - 2 for Tube/NR
journeys on the FCC side and 2 for Tram journeys on the other side.
One of each is marked with appropriate notices.