Thameslink programme to go ahead "in it's entirety"
On Nov 26, 5:54*pm, D7666 wrote:
On Nov 26, 3:22*pm, Jamie *Thompson wrote:
I've been trying to find out what's planned for the 365s, to no avail
though.
Unlike FCC/TL 319s that are all deployed on current TL services that
remain TL services therefor get replaced by new stock, many FCC/GN
units (the majority in fact if you count 313s in the fleet totals) do
not work services that are intended to run over TL. There is no reason
to suppose 365s will be cascaded anywhere at this moment in time and
we probably won't know until the x-IEP EMU is known and confirmed for
the KL line.
--
Nick
I cant quite grasp this. Currently there are 15tph trains through the
core in the peak. That the plan is to run 24 ie 9 extra. Several of
these must be coming off the GN. Peterborough and Cambridge feature on
the proposed route maps. Unless there are some spare paths available
on the GN, surely the additional trains through the core must be
mainly extensions/replacements for existing trains operated by
317/365 ? Which means the existing units must be thrown surplus if the
trains through the core are worked by the new fleet. So where are they
going? Or are they to replace the 313's?
I accept there may be an argument for using IEP to free up paths, but
this would just replace either existing kit or the new units-you still
end up replacing something unless you are providing more or longer
trains.
All this (IEP apart) really begs the question as to why we need any
new rolling stock to complete the Thameslink programme.
Thus to quote a famous sage on another thread -"The entire original
GLC / NSE Thameslink scheme paid for itself by introducing
operational
efficiency in train fleets. There were 48 317s, of which 46 were
needed to operate BedPan. The very original Thameslink service was
only 46 319s (the other 14 originals were ordered before the service
started but were extra to the original plan). Those same 46 319s did
all that the 46 317s did AND eliminated a goodly number of EPBs, all
by through running and no terminals dead time"
Surely the same principles apply now? The 20 minutes or so to run
through the core being less than the combined time to turn round an
existing service at Kings Cross and an existing service at a Southern
terminal. Why cant existing Electrostars on the Southern lines be
adapted to work north through the core and beyond?
Similarly adapt the 365's to work through.
The money saved by not buying a fleet of 1200 vehicles would for
example probably pay for a lot of new electrification elsewhere.
|