113 cancellations on FCC Thameslink
Appeared on web site in only the last 30 mins, it was not there when I
checked at 10:20
:
Major disruption
Monday morning service
Thameslink route
A power cut in the Farringdon area is contributing to significant
disruption caused by the extreme weather conditions and last night's
extreme frost which reached -13 degrees in some places. A separate
power cut has also affected our information systems which are
incorrectly showing our services as cancelled. In fact, we are
operating a revised timetable as follows:
There are no services across central London or between Wimbledon and
Sutton and London.
London Bridge - Brighton we are operating two trains per hour as
follows:
From London Bridge: xx12 and xx42
From Brighton: xx07 and xx37
St Pancras International - Bedford we are operating four trains per
hour as follows:
From Bedford: xx:10 and xx40 all stations; xx00 and xx30 all stations
to St Albans and then fast to West Hampstead and St Pancras
International.
From St Pancras International: xx14 and xx44 all stations to Bedford;
xx09 and xx39 to West Hampstead, St Albans then all stations to
Bedford.
Network Rail is working hard to restore services across central London
which will allow us to resume services on the Wimbledon/Sutton loop.
--
Nick
|