View Single Post
  #6   Report Post  
Old August 3rd 11, 06:19 PM posted to uk.transport.london
Roland Perry Roland Perry is offline
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Thameslink North South connections

In message , at 12:46:02
on Wed, 3 Aug 2011, remarked:

Having re-read what Paul has written it looks like the through trains
from Horsham will only stop (I'm guessing here) at Stevenage, Hitchin,
Letchworth, Baldock and Royston.


What's going to serve the various intermediate stations north of
Baldock? Colin's been thinking there's a previous undisclosed 5th
train per hour terminating at Kings Cross.


Maybe they will run more trains?


Possible, but you'd have expected that to have emerged by now.

Could the Letchworth terminators be extended?


They are going round the Hertford loop to Moorgate, in the final scheme,
I think (confirmation welcome). Not so useful for commuters to the
village stations - you'd be pretty much forced to change at Royston to
keep the journey time bearable.

Again, you'd think that things like that would have been discussed.

Shepreth and Foxton are a pain because they have AHB crossings at the
London end so over length trains cannot stop in the down direction.


Foxton's a full barrier (with signal box next door). Shepreth might
need converting, a drop in the ocean compared to all the other
Thameslink upgrades.


There may be a signal box next door but it doesn't control Foxton level
crossing. That is controlled by CCTV from Cambridge panel. Some nice stills
in the Cambridge News recently too. ;-)


--
Roland Perry