Thread
:
E-petition: "Re Nationalise Railways"
View Single Post
#
23
August 20th 11, 09:15 PM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
E-petition: "Re Nationalise Railways"
In article ,
(Paul Scott) wrote:
"Tony Dragon" wrote in message
news
I seem to recall that the wait for the doors to open was due to
waiting for a GPS signal to say it was OK.
It isn't on SWT Desiros - the guard's door opens as soon as he
operates the controls. The delay is then down to the time taken for
him to check the train is correctly platformed; he then releases the
rest of the doors. AIUI GPS is only used to trigger the
announcements on SWT.
Oh really? That's appallingly slow then. Having seen a guard operate the
doors in front of it surprises me too.
SN's units do use GPS (and CSDE) so their Electrostar doors are
enabled as soon as they come to a halt.
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]