Thread
:
Decision on rail link due before Christmas
View Single Post
#
20
November 12th 11, 01:38 PM posted to uk.transport.london
Paul Cummins[_4_]
external usenet poster
First recorded activity at LondonBanter: Jun 2011
Posts: 52
Decision on rail link due before Christmas
We were about to embark at Dover, when
(Charles Ellson) came up to me and whispered:
You can e.g. send LU and NR electric stock into
Richmond but neither can take the wrong direction at
Gunnersbury as
one requires power between the 3rd and 4th rails and the other
requires the power supply between the 3rd rail and one running
rail.
Normal LU signalling is not intended to have traction currents
flowing
in the running rails.
There's no reason what LU stock can't be converted to third rail
operations - cf. 1939 stock on the Isle of Wight.
--
Paul Cummins - Always a NetHead
Wasting Bandwidth since 1981
IF you think this
http://bit.ly/u5EP3p
is evil
please sign this
http://bit.ly/sKkzEx
---- If it's below this line, I didn't write it ----
Reply With Quote
Paul Cummins[_4_]
View Public Profile
Find all posts by Paul Cummins[_4_]