"Roland Perry" wrote in message
...
A train I was on went through three weeks ago, and it looked finished at
platform level. Lots blokes in hi-vis wandering around inspecting it.
When did they remove the temporary "tunnel" erected to protect the through
trains?
The protection shield was removed about 9 months ago, IIRC.
I see the BBC have attempted to describe the reopened tube station he
http://www.bbc.co.uk/news/uk-england-london-17090565
They have used an artists impression of the south bank rail station
entrance, and then wrongly described the tube station as having a new south
bank entrance.
(As of 1230 today, so I'll send them a critique...)
Paul S