View Single Post
  #79   Report Post  
Old February 26th 12, 09:24 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
77002 77002 is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2011
Posts: 267
Default Plans to start Croxley Rail Link services in 2016

On Feb 25, 7:39*pm, "Peter Masson" wrote:
"77002" wrote



If my memory serves, and it has been a while: The Windsor Platforms
had a different style roof from the mainline side. *It was this part
of the station that was dismantled in order to build the International
station. *IIRC a signal box was also removed and the approaches
straightened.


The 19th century North station was the last to be built before the whole
station was redeveloped in the early part of the 20th century. The roof of
this North station was in good condition, so was not replaced in the general
rebuilding. This then became the Windsor lines part of the station, and as
you say, was replaced when International was built.

Among other changes when International was built, the north Yard was
abolished, along with the hoist down to the W&C - so since then stock for
the W&C has to be caned in and out of the W&C Yard.

It is a pity the W&C cannot be extended to form a more useful thru
route. It might then have a proper depot, somewhere.