Thread
:
Crossrail tunnelling to start shortly
View Single Post
#
2
March 22nd 12, 02:03 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
boltar2003@boltar.world
external usenet poster
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Crossrail tunnelling to start shortly
On Thu, 22 Mar 2012 14:18:40 +0000
Recliner wrote:
On Thu, 22 Mar 2012 13:46:55 +0000 (UTC),
d
wrote:
On Thu, 22 Mar 2012 05:23:19 -0700 (PDT)
77002 wrote:
By the time Crossrail is built, Paddington to Reading will be
electrified. Crossrail will run to Reading.
Well yes, thats part of the scheme.
Is it? When was that announced?
Unofficially. Maidenhead is hardly the most logical place for a terminus.
Presumably improved now that the Moorgate branch is no more? But
Perhaps, I haven't been on it since that closed. Though given that section
didn't have much traffic
there's still the need to change voltage at Farringdon, something that
won't be needed with XRail.
That takes seconds. The main issue when I used it was the slow speed on the
line itself and the constant stopping.
B2003
Reply With Quote
boltar2003@boltar.world
View Public Profile
Find all posts by boltar2003@boltar.world