On Thu, 05 Apr 2012 01:27:00 +0100
" wrote:
On 04/04/2012 10:18, Someone Somewhere wrote:
On 04/04/2012 10:10, d wrote:
Just curious to know what is the state of the tunnel that used to link
the Met to the ELL. Has the track been lifted and the tunnel sealed off
or is it all still in place "just in case"?
B2003
http://www.districtdavesforum.co.uk/...splay&thread=1
701
Seems to imply that the tunnel is blocked off and various bits of the
track have been lifted.
I thought that it was lifted almost as soon as they shut Shoreditch station.
I imagine that would have made getting the met trains off the line a bit
problematic when the whole line was closed because AFAIR shoreditch closed
quite a time before the rest of the line.
B2003