London 2012: TfL details Games rail and Tube hotspots
On 23/04/2012 13:59, Robert Neville wrote:
Paul wrote:
Actually there is no great concern about Heathrow to London services
other than on the last day of the Olympics when there is a mass
departure. Arrivals are staggered over a much longer period and won't
overload the services. This is based on informed discussions I had
several months ago with a range of people who know what is planned.
Furthermore, it's not like the airlines are putting on extra flights to handle
extra passengers, even if slots were available - and there aren't. Given that
the flights are mostly full already and there aren't larger planes sitting
around waiting to be substituted in, I doubt it's even going to be noticable.
The main difference will be that a greater proportion than usual will
not be transit passengers but using LHR as their final destination.
--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail
|