View Single Post
  #6   Report Post  
Old November 19th 12, 07:20 AM posted to uk.railway,uk.transport.london
D7666 D7666 is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 529
Default Ultimate signaling balls up at London Bridge

On Nov 18, 10:51*pm, D7666 wrote:
On Nov 18, 10:39*pm, D7666 wrote:

No longer possible. There is no pointwork at Borough Market Junction any
more - London Bridge platforms 4, 5, and 6 and the Up Passenger Loop only
lead to/from Metropolitan Junction (thence Charing Cross or Blackfriars)
while platforms 1, 2, and 3 only lead to Cannon Street.

I admit to not studying the current layout ... but I am under the
impression it is still possible to create a gridlock somewhere around
there.


Cambria / Loughborough / CanterburyRd Jn.s ?

I'm sure its got something to do with ECS moves on one side of the
triangle, perhaps I was thinking of the west side of the Borough
market triangle which is ECS only instead of the west side of that
one, which is also ECS only, and both curves take 12car ECS (actually
the same ECS trains).



I'm still trawling the grey cells for this, I'm sure there is one in
the south eastern area and it involves ECS and/or 12car trains.

Borough Market is clearly wrong, not sure what brain glitch caused me
to write that.

--
Nick