Thread
:
Silly 'break of journey' question
View Single Post
#
19
July 25th 13, 12:59 PM posted to uk.transport.london
Roland Perry
external usenet poster
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Silly 'break of journey' question
In message , at 07:09:47
on Thu, 25 Jul 2013,
remarked:
Modulo the minimum interchange time which seems to have gone AWOL
from the National Rail site, but is unlikely to be as little as 4
minutes I'd have thought.
[Although of course, these two trains used to be a guaranteed
connection, because both being run by Central they swapped crew at
Ely, so that the Norwich crew from the train bound for Cambridge
would have taken the ex-Liverpool/Sheffield train onwards to Norwich,
and the Liverpool/Sheffield train's crew would have finished their
shift with a short hop to Cambridge.]
Ely is 6 minutes in Table 17 of the GBTT which is still obtainable from the
Network Rail web site.
Thanks for that.
I wonder when these numbers disappeared from the National Rail site?
--
Roland Perry
Reply With Quote
Roland Perry
View Public Profile
Find all posts by Roland Perry