View Single Post
  #71   Report Post  
Old April 19th 04, 06:25 PM posted to uk.transport.london
Annabel Smyth Annabel Smyth is offline
external usenet poster
 
First recorded activity at LondonBanter: Apr 2004
Posts: 374
Default CrossRail or CrossConnections? Guns or butter?

On Sun, 18 Apr 2004 at 20:07:26, Dave Arquati wrote:

Well, the ELL will be running 4tph along the South London Line to
Clapham Junction whenever it finally opens (2010 is currently floated).

Hmmm, useful. I thought it was going to Streatham, though, and that
way, or have they changed it yet again?
--
Annabel Smyth
http://www.amsmyth.demon.co.uk/index.html
Website updated 8 March 2004