Thread
:
First Class 700 arrives at Three Bridges
View Single Post
#
18
August 1st 15, 08:48 AM posted to uk.transport.london
Roland Perry
external usenet poster
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
First Class 700 arrives at Three Bridges
In message , at 02:30:21
on Sat, 1 Aug 2015,
remarked:
4 cars, when I thought 700's were going to be in fixed 8 and 12 car
formations.
Yes! I looked at the pictures and wondered where the other cars were
I suppose if they want to use it for testing, a short-formed one is
going to be almost as good as a regular one.
As for the mystery of why GN's Connections magazine thinks 700's will be
running to Kings Lynn, some exchanges on Twitter, and a lot of reading
between the lines, suggests that when they say:
"we will begin to introduce them on the London King’s Cross to
Cambridge, King’s Lynn and Peterborough routes later [in 2016]"
For the Kings Lynn trains they mean "the handful a day which are
currently 8-car 365's". The 377's will therefore arrive later, perhaps
after a delayed cascade from Thameslink due to issues with deploying
700's on that route.
--
Roland Perry
Reply With Quote
Roland Perry
View Public Profile
Find all posts by Roland Perry