Thread
:
Goblin electrification
View Single Post
#
7
October 1st 15, 02:23 PM posted to uk.transport.london
[email protected]
external usenet poster
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Goblin electrification
In article ,
(Mike
Bristow) wrote:
In article
-september.
org, Recliner wrote:
[the goblin]
Are the platforms already long enough for four-car trains?
No. Most stations that used to have longer platforms have had the
length beyond two car closed. This would be easy to fix - repoint
the brickwork, repaint all the things, etc. But South Tottenham
would be more challenging - extending westwards is tricky becuase
there's a bridge over the A10 that way; extending eastwards is
tricky becuae there's a junction that way. Google maps will give
you a picture - literally.
Luckily 378s have SDO.
--
Colin Rosenstiel
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]