View Single Post
  #5   Report Post  
Old December 9th 15, 11:01 PM posted to uk.transport.london,uk.railway
Basil Jet[_4_] Basil Jet[_4_] is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Crossrail 2 meeting in Wimbledon on Monday 7th December

On 2015\12\09 22:02, Peter Smyth wrote:
Michael R N Dolbear wrote:


"Basil Jet" wrote in
On 2015\12\03 23:35, Basil Jet wrote:
http://heyevent.uk/event/uze6be673jx...public-meeting


There was a guy in the crowd who had calculated, using TfL's
figures,

that diverting the Wimbledon - Clapham Junction trains via Balham
would cost, I think, 1.6 billion a year in extra electricity!

I don't think that would pass the More Or Less test.

Isn't it more than NR or TfL currently spend on Traction Electricity ?


http://www.railwaygazette.com/news/s...-contract.html

Network Rail apparently use 3.2TWh a year. At EDF Energy's cheapest
public tariff that would cost £359 million (although I hope NR have
negotiated a better deal than that!)


He definitely said billion, not million. None of the TfL engineers or
Network Rail bods on the stage contradicted him. Thanks.