Goblin to close for Electrification work
On 16/02/2016 11:38, Basil Jet wrote:
I'm surprised they are not making them 5-car so they can pool spare
units with the North London Line (I assume they are connected at Clapham
Junction).
The NLL with the Goblin at Clapham Junction? Huh?
|