Heathrow-Croydon-Gatwick by rail
In article , Dave
writes
How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail
connection ? It would reduce M25 load,*wouldn't it ?
I believe that all it needs is a small section of track to link the
GWML to the WLL to enable through running.
There's already a link a bit further west, travelling via Willesden.
Problem then would be fitting them in amongst all the existing
services, which won't be easy.
Exactly.
--
Clive D.W. Feather, writing for himself | Home:
Tel: +44 20 8371 1138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Written on my laptop; please observe the Reply-To address
|