Park Royal Station
On Wed, Aug 07, 2019 at 12:25:51AM +0100, Basil Jet wrote:
The remainder of the site is now being built on with a residential
development called "Regency Heights", and it looks as if no new
platforms are now required. It would be great to have someone from Brent
Council (or is it Old Oak and Park Royal Development Corporation)
explain why a sixth office block would require new Central Line
platforms, but that 807 new homes don't.
I would presume that those 800 new homes are expected to have a
different traffic pattern from a new office block, and so not need the
extra infrastructure.
--
David Cantrell | London Perl Mongers Deputy Chief Heretic
More people are driven insane through religious hysteria than
by drinking alcohol. -- W C Fields
|