View Single Post
  #11   Report Post  
Old April 10th 21, 09:41 PM posted to uk.railway,uk.transport.london
Graeme Wall Graeme Wall is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,715
Default LO lines to be named

On 10/04/2021 20:36, Anna Noyd-Dryver wrote:
Roland Perry wrote:
In message , at 15:32:14 on Sat, 10 Apr
2021, remarked:
On Sat, 10 Apr 2021 15:16:50 -0000 (UTC)
Sam Wilson wrote:
wrote:
H2 has over batteries is recharge time, other than that its hopeless.

That’s a not inconsiderable advantage!

It is, but otoh once - one hopes - street recharging via some sort of
infrastructure built into street lights or similar for those who don't have
driveways becomes the norm in a decade or 2, that advantage will become
redundant except for the very few people who need to do ultra long journeys
without much in the way of stopping.

The main issue with EVs isn't the battery vs H2 argument , its where the power
is going to come from to power them all in the first place because right now
the generating capacity simply isn't there


And nor of course is there much more than 13A ring main linking up the
streetlights in any one street.



Streets and pavements are dug up often enough for other reasons, that doing
it again to upgrade the wiring/install a parallel circuit, isn't the end of
the world.


Even assuming you can distribute enough power to make them function,
there aren't enough lamposts available for all the people who are likely
to want to use them.

--
Graeme Wall
This account not read.