Roland Perry wrote:
In message , at 14:42:30 on Sun, 11
Apr 2021, Marland remarked:
I think it was the 1970’s when the lightening protection cable
linking the pylons out of Fawley was replaced by a new combined cable
developed by BICC as one of the first experimental links to use it.
The Energis Internet backbone.
And later similar techniques by Scottish Power/Scottish Telecom/thus/Cable
& Wireless/Vodafone. I think the rump is still in the Vodafone empire.
Sam
--
The entity formerly known as
Spit the dummy to reply