Siddings at Neasden are still in use every day with sand trains to london
concrete depot.
--
---------------------------------------------------------------------
"Are you still wasting your time with spam?...
There is a solution!"
Protected by GIANT Company's Spam Inspector
The most powerful anti-spam software available.
http://mail.spaminspector.com
"Adrian Hudson" wrote in message
m...
Dave Arquati wrote in message
...
John Rowland wrote:
Hi all,
According to
http://www.chilternrailways.co.uk/pa...s/projects.asp , it
will
take 15 months to build and will complete in April 2005, so it should
be
under construction by now. I can't say I've noticed, but if it's on
the
north side of the railway it would be part of the Stadium construction
site
so wouldn't necessarily be discernable from the surrounding roads..
ANyone
know more?
It's on the southern side of the railway (east of the station I think).
There's lots of work going on; last time I went past (last month) there
were various pieces of heavy equipment around and most of the embankment
had been dug up.
And what was wrong with Neasden? Perfect site for a depot, one would
have thought! :-)
A.