View Single Post
  #9   Report Post  
Old November 29th 04, 05:54 PM posted to uk.transport.london
Tom Anderson Tom Anderson is offline
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 3,188
Default The BBC on Crossrail

On Mon, 29 Nov 2004, Dave Arquati wrote:

Aidan Stanger wrote:
Dave Arquati wrote:

Aidan Stanger wrote:

Tom Anderson wrote:

On Thu, 25 Nov 2004, Dave Arquati wrote:

then following the North London Line route to Stratford.

Clearly, the only sensible solution is up the West Anglia from
Hackney.

I couldn't disagree more. Firstly, although Stratford's links with
much of Central London are good, there is no direct line to Kings
Cross.


It's always Stratford, Stratford, Stratford! What's so great about
Stratford anyway? Bah!

Secondly, Hackney's links with Stratford are currently inadequate -
the trains are infrequent, short and overcrowded. Thirdly, a well
designed Hackney station would incorporate Hackney Downs station, so
you would still get the benefits while the trains continue to serve
the popular destination of Liverpool Street.

Stratford will have a link to Farringdon with CR1; it's only a short
hop from there to King's Cross. And an upgrade of the NLL would go
towards improving links between Hackney and Stratford. I would say
that giving the West Anglia lines (particularly the Lea Valley) a
direct link to the West End would give greater regeneration benefits
than going to Stratford, which will already have some impressive new
links.


But if the West Anglia lines gained a direct service to the West End,
it would be at the expense of their direct service to the City, so
they'd be worse off.


Fair enough, they'd be worse off if CR2 replaced their direct services
to the City.


It wouldn't have to replace it - there could be two routes south from
Hackney. I'm not sure if this would be a good idea from an operational
point of view, though - shades of the Bakerloo. On the other hand, if this
was going to be CR2 rather than CH, ie a NR-style moderate-frequency
timetabled service, rather than a LU-style high-frequency random service,
it might work alright.

However, extra capacity and better connections will be urgently needed
further up the Lea Valley and near to Stansted will be needed if
government plans for significant house-building in this area are given
the go-ahead.


A CR1 branch up the Lea Valley Line would do this, though. I refuse to
believe CR1 can't support three interfaces at each end. Or, if it's stuck
at two, maybe this route will be added when the Docklands branch is
eventually cut back to non-existence!

The Victoria line will also be in urgent need of congestion relief.

Taking over the Central Line from Stratford serves neither objective,


And that's the rub - even if CH did take over the NLL route to Stratford,
where would it go afterwards? The Central Line is daft, the GE's
Crossrailed already, which basically only leaves the Lea Valley Line - and
KX - Hackney - Stratford - Tottenham Hale is, if you'll excuse the pun,
completely loopy! Unless you're proposing to take over the DLR?

tom

--
A is for Absinthe, for which I now thirst