Dave Arquati wrote:

Aidan Stanger wrote:
Tom Anderson wrote:

On Mon, 29 Nov 2004, Dave Arquati wrote:

Aidan Stanger wrote:

Dave Arquati wrote:

Aidan Stanger wrote:

Tom Anderson wrote:

On Thu, 25 Nov 2004, Dave Arquati wrote:


then following the North London Line route to Stratford.

Clearly, the only sensible solution is up the West Anglia from
Hackney.

I couldn't disagree more. Firstly, although Stratford's links with
much of Central London are good, there is no direct line to Kings
Cross.

It's always Stratford, Stratford, Stratford! What's so great about
Stratford anyway? Bah!


Biggest interchange in NE London. Major shopping centre. Highrise
development planned.

Secondly, Hackney's links with Stratford are currently inadequate -
the trains are infrequent, short and overcrowded. Thirdly, a well
designed Hackney station would incorporate Hackney Downs station, so
you would still get the benefits while the trains continue to serve
the popular destination of Liverpool Street.

Stratford will have a link to Farringdon with CR1; it's only a short
hop from there to King's Cross. And an upgrade of the NLL would go
towards improving links between Hackney and Stratford. I would say
that giving the West Anglia lines (particularly the Lea Valley) a
direct link to the West End would give greater regeneration benefits
than going to Stratford, which will already have some impressive new
links.

But if the West Anglia lines gained a direct service to the West End,
it would be at the expense of their direct service to the City, so
they'd be worse off.

Fair enough, they'd be worse off if CR2 replaced their direct services
to the City.

It wouldn't have to replace it - there could be two routes south from
Hackney. I'm not sure if this would be a good idea from an operational
point of view, though - shades of the Bakerloo. On the other hand, if this
was going to be CR2 rather than CH, ie a NR-style moderate-frequency
timetabled service, rather than a LU-style high-frequency random service,
it might work alright.

However, extra capacity and better connections will be urgently needed
further up the Lea Valley and near to Stansted will be needed if
government plans for significant house-building in this area are given
the go-ahead.

A CR1 branch up the Lea Valley Line would do this, though. I refuse to
believe CR1 can't support three interfaces at each end. Or, if it's stuck
at two, maybe this route will be added when the Docklands branch is
eventually cut back to non-existence!

The Victoria line will also be in urgent need of congestion relief.

Taking over the Central Line from Stratford serves neither objective,


An interchange at Hackney does.


Not well. It won't improve capacity northwards to the
London-Stansted-Cambridge corridor which those development agencies keep
yapping about. It could relieve the Victoria of West Anglia interchange
passengers, true - but at the expense of merely extending their journeys
on unimproved WA services to Hackney.

And that's the rub - even if CH did take over the NLL route to Stratford,
where would it go afterwards? The Central Line is daft,


Agreed.


the GE's Crossrailed already,



It could take over the slow service to Romford, with CR1 losing all
intermediate stations except Ilford. But this would probably require
more tracks, which may make it too expensive.


What's the point? Readjustment of services on the Great Eastern with
Crossrail will already provide superb connectivity to central London and
18tph. Spread the benefits out a bit.


Spreading them out a bit mo Southampton, Clacton etc...

Why would the other GE services be readjusted? I thought Crossrail would
be using the slow lines and not affecting the other services at all. Is
it to do with the Liverpool Street approach tracks bottleneck?

which basically only leaves the Lea Valley Line - and KX - Hackney -
Stratford - Tottenham Hale is, if you'll excuse the pun, completely loopy!



True. I think this would make an excellent Jubilee extension, but I
haven't found anyone else who does.


They're already planning to run NLL services up the Lea Valley from
Stratford to somewhere.


Only because of the lack of a proper interchange at Hackney, and they're
only planning it because they don't know what else to do with the NLL.
Anyway, as Tom pointed out, that route's completely loopy.

Anyway, where do you want to extend the Jubilee to?


Tottenham Hale. I'd originally thought it Enfield Town might be a good
terminus, but having walked the dismantled section between Edmonton and
Angel Road, I can see that relaying it would be rather too disruptive
(and therefore expensive) to justify it.

It won't provide a decent service from the Lea Valley to central
London (too slow)... might do to Canary Wharf though. Given the
passenger numbers involved, surely it's probably more cost-effective to
let them use extended NLL services or new services and change at Stratford?


The idea was to increase Canary Wharf catchment area at a small fraction
of the cost of a Crossrail branch.

Unless you're proposing to take over the DLR?


There is one other option that's not DLR (yet): The Woolwich Branch. If
it doesn't become part of CR1, it could become part of CR2 until a new
direct line is constructed (which could take decades).


Westminster & TfL are quite keen on DLR-ising that.


I know. Unimaginitive, aren't they????

Besides, it seems a bit inefficient to cart the denizens of LB Newham
around Hackney before dropping them off in central London.


A bit, but not as inefficient as building a Crossrail tunnel all the way
to the Royal Docks.