Extra Carraige on the Edware Road branch?
On Sat, 23 Apr 2005 15:01:32 +0100, Dave Arquati wrote:
Chris! wrote:
I was supprised today to read in the leaflet for the conservative
candidate in Putney that:
"LU have agreed to add an extra carriage to Edgware Road tubes"
Is this possible? I thought the platforms were shorter beyond High St
Ken? Where are the carriages coming from - will there be less but
longer trains?
Or did she make it up?
The new common subsurface stock, due in 2011ish, will have walk-through
connections between carriages, and I believe it will have shorter
carriages too - presumably enabling it to run anywhere on the subsurface
network. Someone may be along shortly to correct me.
What I doubt is that any particular MP had anything to do with the
specification of the new SSL trains.
IIRC there is a contract option to allow for 7 car instead of 6 car
operation on the Circle, H&C and Wimbleware part of the SSL network. I
think the prospective parliamentary candidate may be referring to that.
I shall have to check to see if LUL has exercised that option or not.
--
Paul C
Admits to working for London Underground!
|