Extra Carraige on the Edware Road branch?
Paul Corfield wrote:
IIRC there is a contract option to allow for 7 car instead of 6 car
operation on the Circle, H&C and Wimbleware part of the SSL network.
I
think the prospective parliamentary candidate may be referring to
that.
I shall have to check to see if LUL has exercised that option or not.
Hi Paul,
Thanks
Would those 7 cars be the same total length as the current 6 then? Or
would platforms need extending? Or am I completely wrong in thinking
the current 6 car ones fill the platform at some stations.
--
Chris
|