View Single Post
  #23   Report Post  
Old August 10th 05, 02:54 PM posted to uk.transport.london
asdf asdf is offline
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 1,150
Default Thameslink 2000 Blackfriars

On Wed, 10 Aug 2005 08:18:44 +0100, Roland Perry
wrote:

Exactly. Send all the services (from the Elephant & Castle direction)
that currently terminate at Blackfriars through the tunnel to
Farringdon and beyond. Terminate an equivalent number of services from
the London Bridge direction at Blackfriars. Seems a far more sensible
and sane solution than ripping apart the entire station.


Then you wouldn't get the through services from Gatwick (and other
planned destinations) to north of the river, as they mainly go via
London Bridge.


You still would, as the number of services via Elephant terminating at
Blackfriars is relatively small, so running them through the tunnel
would only displace a proportion of the London Bridge services. Unless
the plans involve significantly increasing SET services to
Blackfriars?

I really don't see why heaven and earth need to be moved just so that
a few people coming from one direction have to change trains instead
of a few people coming from the other direction. Especially with the
huge cost of the project threatening its very viability.