On 13 Jun 2006 12:39:08 -0700, "Adrian Auer-Hudson, MIMIS"
wrote:


Peter Smyth wrote:

How feasible would it be to segregate the lines at Edgware Road by having
the through trains to/from Hammersmith using the north island and the
terminating trains from Bayswater using the south island? This would remove
all conflicting moves in this area.

Peter Smyth


That would not help. The pair of tracks from Paddington Mainline and
the pair from Bayswater merge on a flat junction well before Edgware
Road, IIRC.

Praed Street Junction.
snip
--