Thread
:
TfL Route 395
View Single Post
#
3
July 10th 06, 10:56 AM posted to uk.transport.london
Colin Rosenstiel
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
TfL Route 395
In article . com,
() wrote:
Paul Corfield wrote:
There are width restrictions at both entrances [to the
Rotherhithe Tunnel].
There are also very tight clearances where there the tunnel
changes direction.
This is something that's always puzzled me - why does the
Rotherhithe Tunnel change direction? Surely, when it was being built,
it would have been cheaper and easier to just go in a straight line?
Yet it twists and turns constantly.
I thought there were just two turns, from the approaches that are
closely parallel to the river to and from the stretch under the river.
--
Colin Rosenstiel
Reply With Quote
Colin Rosenstiel
View Public Profile
Find all posts by Colin Rosenstiel