Thread
:
DLR to Charing Cross
View Single Post
#
8
October 17th 06, 09:11 AM posted to uk.transport.london
Londoncityslicker
external usenet poster
First recorded activity at LondonBanter: Feb 2004
Posts: 62
DLR to Charing Cross
wrote:
MIG wrote:
The the extension of the DLR will assist with creeping privatisation I
suspect, since the DLR isn't run by LU.
But my problem with it is that there would then be stumps at both Tower
Gateway and Bank. Various unpleasant possibilities a
1) One of the stumps closes.
2) There are infrequent or irregular services to each branch.
3) There are truncated journeys with limited patterns.
I know it's a bit like that already, but this could result in an
increased number of changes for existing journeys, despite it
apparently being a new through service. The DLR will effectively be
divided into a number of separate lines, even more than it currently is.
Maybe they could close Tower Gateway and have an station below ground
at Tower Hill on the new Charing X branch? That way the
Circle/District would get a decent connection with the DLR at long last.
The interchange between DLR and tube at Tower is far faster and less
hassle than most other big interchanges in town.
Reply With Quote
Londoncityslicker
View Public Profile
Find all posts by Londoncityslicker