View Single Post
  #33   Report Post  
Old October 18th 06, 02:38 PM posted to uk.transport.london
Boltar Boltar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default DLR to Charing Cross


asdf wrote:
IIRC the escalators to the Jubilee line platforms at CX were
officially "life-expired" and would have had to have been replaced for
passengers to continue to have been allowed to access the platforms.


Fair enough , but if the usage would be as low as LU suggested once
the JLE opened then they could just shut the escaltors down and
leave them to be used as stairs and let the public decide if they
could be bothered to walk it or not.

B2003