Bob wrote:
http://www.transportbriefing.co.uk/story.php?id=3741
Members also called for the route to be fully linked up with the
proposed tram line along Oxford Street
Surely the Oxford St Tram would be built later, in which case they should be
arguing for the Oxford St Tram to fully link up with CRT, rather than the
other way round.