View Single Post
  #7   Report Post  
Old February 13th 07, 01:54 PM posted to uk.railway,uk.transport.london
Paul Scott Paul Scott is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Old Dalby Test Track to be used by Metronet


"Nick Leverton" wrote in message
...

Metronet to electrify at least 4 km with 3rd and 4th rail for LU stock
testing...


Will the Test Track then be joining the select stretches of line with
third and fourth rail electrification plus 25kV overhead, as a fully
featured test track for the UK, or (more probable I guess) will the
overhead be decommissioned ?


I think you'd have to read between the (running?) lines a bit for the answer
to that...

Paul