Turnham Green 24/25 February
In message , Peter Smyth
writes
"Mizter T" wrote in message
roups.com...
I also see that on the weekend of 12-13 May and 9-10 June that "Hatton
Cross - Heathrow Terminals 123" will be closed - I guess this is
connected to work on a junction for the branch to the new Terminal 5
station. Does this mean that trains will run:
Hatton Cross - T4 - T123 - reverse T4 - Hatton Cross ?
I very much doubt it, I suspect the whole loop will be closed. HX - T4 -
T123 is only single track so you could only run a train every 20 minutes at
best plus the signalling isn't set up for this.
Trains are timetabled to go round the loop every 5 minutes in normal
operation. You can actually get a few more than that round and, of
course T123 to Hatton Cross is normal two way working.
I think the work is more to do with testing and proving the new
signalling - most of the construction type work has been complete for
some time.
--
Steve Fitzgerald has now left the building.
You will find him in London's Docklands, E16, UK
(please use the reply to address for email)
|