canning town jubilee line replacement program
On Aug 31, 11:27 am, Boltar wrote:
On Aug 31, 11:23 am, Kev wrote:
They replaced the escalators at North Greenwich also. Let's not
mention the replacement signalling system.The JLEx sure must have been
a pile of ****e.
Probably like most thing in short-termism Britain - built to a low
cost. No doubt the people responsible have long since moved on and
won't have to explain why in the end it'll cost far more than if
they'd spent a bit more money in the first place.
B2003
To get the line open ASAP, they didnt bother with moving block
sections or ATO, instead just having the same signalling systerm, but
as a fixed block with Train Stops.
|