Tube Lines construction at Stratford
On Aug 31, 12:02 pm, "Chris Read" wrote:
"Paul Corfield" wrote:
I think it is new Train Crew Accommodation. Extra accommodation is
provided as part of line upgrades as LU will need extra train drivers to
operate the more frequent services. Tube Lines are required to do the
work as part of the upgrade obligations.
Will be interesting to see how the Jubilee copes with a more frequent
service. The signalling cannot cope with the present headways, and the
station dwell times on the JLE horrendous.
Chris
ATO like on the Central will mean more trains, running faster and more
often. At the moment as there are so few signals (being installed as
Moving Block) there are bigger gaps in the service.
Oh and with it being a TubeLines building, expect the windows to leak
and the doors to not shut!
|