ELLX phase 2
On 14 Dec, 16:06, wrote:
While on the ELL the other day I noticed what looked like some
extensive prep work being done at the proposed junction with phase 2
(just about here -http://maps.google.co.uk/maps?f=q&hl=en&geocode=&time=&date=&ttype=&q...
- apologies for the long link). Has phase 2 already been alocated some
funding?
No. Double track has been laid at the Silwood Triangle works site
which can only have one use - sidings to load and unload works trains
to take construction material up and down the line.
It will presumably be connected once the ELL closes for passenger
services later this month.
However phase 2 would indeed use an alignment along that side of the
Silwood Triangle.
|