On Jan 21, 9:14*pm, Jamie Thompson wrote:
I was looking at the South London options for developing the network
the other day, and it seems to me that the Hayes branch is pretty much
the only option for the DLR, so it should probably go to that, with
the Bakerloo going elsewhere, though going through Lewisham is
probably still a good idea.
I am not sure that the DLR would offer sufficient capacity down the
Hayes corridor - the South of London RUS is now proposing 6 twelve car
trains per hour in the peak. Plans for the original Fleet line to link
Lewisham with Fenchurch Street were abandoned in 1977 and at that time
an extension of the East London Line from New Cross to Lewisham and
from Shoreditch to Liverpool Street were proposed instead. Thereafter
long grass grew and memories faded. Under the current proposals, I
have always felt that New Cross, like Elephant and Castle, is too
close to the City to be a viable terminus and that an ELL phase 3
extension to relieve Lewisham, possibly going on to Hayes would be a
good idea. It would at some point be necessary to tackle the four
coach constraint limit on the Canada Water - Whitechapel section of
the ELL but I believe that is going to be inevitable anyway sooner or
later. The London Overground proposal already contains links to the
"Not quite Outer Circle" core route from the east from Barking,and the
north from Watford and suggestions were made for a western extension
from Wimbledon to Clapham Junction. Linking the south east quadrant in
a similar manner could be worth considering.