Thread: ELLX phase 2
View Single Post
  #74   Report Post  
Old January 24th 08, 12:30 PM posted to uk.railway, uk.transport.london
Mr Thant Mr Thant is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default ELLX phase 2

On 24 Jan, 11:59, wrote:
That is terribly depressing, isn't it? What happened to the rebuilding
plans?


I believe a new application is slowly progressing, but they're being
very quiet about it. Camden Council recently approved an area plan
that includes the demolition of the buildings above for redevelopment
of the station, so it has a fair chance of going through.

I think the 400m between Camden Town and Road is further than will
ever be put on the tube map.

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London