Default KXSP Phase 2 progress

On 17 Feb, 22:48, lonelytraveller
wrote:
Handover of the roof slab? To whom and why (I suppose one would answer
the other)?


To Network Rail so they can build the western concourse on top of it:
http://www.networkrailmediacentre.co...Categ oryID=8

What is going on with the northern ticket hall anyway, all that mess
on the surface that was there for the tube ticket hall is still there,
and they haven't even got rid of the temporary northern stairs, which
I'd have thought would be a fundamentally important detail in having a
corridor passing through them.


You've lost me there. Which stairs exactly?