How to terminate a North-South HSL in London?
"Peter Masson" wrote in message
...
"Martin Edwards" wrote
(Glasgow - Harwich through train)
I think it was a bit too complicated. It involved a switch from
electric engine to diesel at Willesden.
It was electric-hauled throughout. I think it was before the ECML
electrification, so the Edinburgh portion was diesel-hauled to Carstairs.
When was the NLL AC electrification?
--
David Biddulph
|