Visible signs of Thameslink 2000
Shame they went with the GN link to St Pancras option rather than the
tunnel to Bermondsey. That would probably have given a far greater
benefit (i.e. 48 tph through central London), with less need for the
works at London Bridge (if Thameslink stopped serving London Bridge
and just ran down to East Croydon via Herne Hill), not to mention the
reduction in route pollution.
|