Peter Masson wrote:
"D7666" wrote
There is a substantial uplift in heating effect from the new trains.
Unless my sums are seriously flawed, there'd have to be some seriously
hefty cooling gear to cool stations. Gear that itself draws power ...
maybe more than the entire train regenerated power is taken up by air-
con ?
Add to that the congestion relief works at Victoria and the more
frequent service, there'll be more passengers pumping kilowatts into the
system.
Perhaps the Victoria Line needs to be extended into the open air, at
least so the piston effect of trains can add ventilation into the
tunnels, and ideally so that the next generation (49 stock) can have
aircon that takes heat out of the system and dumps it in the open air.
Take over Chingford from National Rail? Quadruple Northumberland Park to
Cheshunt, with a extended Victoria Line running the local service?
Peter
Wasn't there talk about building a station around Northumberland Park?
|