Thread: Overground
View Single Post
  #125   Report Post  
Old September 21st 09, 12:19 PM posted to uk.transport.london
Andy Andy is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Overground

On 20 Sep, 17:58, wrote:
In article
,





(Andy) wrote:
On Sep 20, 2:10*pm, "Recliner" wrote:
wrote in message
m


One small question - does newer dual voltage stock (since the 313s)
have the capability to switch between third rail and overhead on the
fly between North Pole and Shepherd's Bush? The 313s were designed
only to switch in stations (Drayton Park actually) but no-one
envisaged a changeover point between stations in the 1970s.

The Electrostars can change over on the move, but normally don't. I've
never been on a unit that's done it myself, but know of people who
have. On the West London Line at North Pole Junction, there's little
difference in the time spent stationary between a 313 and a 377,
although the PIS system on a 377 is sometimes still rebooting after
Shepherd's Bush when heading south.


Class 313s can actually change over on the move, very occasionally a
313 will leave Euston on AC and won't stop until arriving at South
Hampstead on DC, I've managed this maneuver at least once during the
rebuild of the Euston station throat.


Hmm. Was that one of the the mods for NLL/Silverlink Metro use? I know
they changed the controls so they can run on DC in parallel as well as in
series.


It may have been, alternatively they may have just tried it out and
found they didn't need to make any mods, it's not like it would be a
complex operation on 1970s designed kit and the DC shoegear is always
in place unlike some of the more modern classes.