![]() |
London and the Southeast 2nd generation RUS
Draft version published today. Large pdf, about 10 Mb
http://www.networkrail.co.uk/browseD...id=2 895&root Follow Route Utilisation Strategies RUS Generation 2 Paul S |
London and the Southeast 2nd generation RUS
"Paul Scott" wrote
Draft version published today. Large pdf, about 10 Mb http://www.networkrail.co.uk/browseD...id=2 895&root Follow Route Utilisation Strategies RUS Generation 2 "This second generation of RUSs has identified three worksteams" (sic)! Hopefully they'll be going on to identify some workdiesels and workelectrics... |
London and the Southeast 2nd generation RUS
On Thu, 16 Dec 2010, John Salmon wrote:
"Paul Scott" wrote Draft version published today. Large pdf, about 10 Mb http://www.networkrail.co.uk/browseD...id=2 895&root Follow Route Utilisation Strategies RUS Generation 2 "This second generation of RUSs has identified three worksteams" (sic)! Hopefully they'll be going on to identify some workdiesels and workelectrics... No, due to the budget cuts, only workpumpwagons. tom -- **** = the new period -- jsolo_uno |
London and the Southeast 2nd generation RUS
On Dec 16, 1:30*pm, "Paul Scott"
wrote: Draft version published today. *Large pdf, about 10 Mb http://www.networkrail.co.uk/browseD...id=2 895&root Follow Route Utilisation Strategies *RUS Generation 2 Paul S "New lines 'may be needed to beat train overcrowding'" http://www.thornegazette.co.uk/news/...ng _1_2863333 NR said that as long as these, and other projects were implemented in full, "overall peak capacity in the London suburban area will largely be able to cope with predicted passenger numbers in 2031, with the addition of some other key measures". "More extensive options - for example, the building of entirely new lines - may be needed," said NR Patrick |
London and the Southeast 2nd generation RUS
"D1039" wrote in message
On Dec 16, 1:30 pm, "Paul Scott" wrote: Draft version published today. Large pdf, about 10 Mb http://www.networkrail.co.uk/browseD...id=2 895&root Follow Route Utilisation Strategies RUS Generation 2 Paul S "New lines 'may be needed to beat train overcrowding'" http://www.thornegazette.co.uk/news/...ng _1_2863333 NR said that as long as these, and other projects were implemented in full, "overall peak capacity in the London suburban area will largely be able to cope with predicted passenger numbers in 2031, with the addition of some other key measures". "More extensive options - for example, the building of entirely new lines - may be needed," said NR The BBC local TV news was already talking about Crossrail 2 (aka the Chelney line) on Friday. |
All times are GMT. The time now is 05:55 AM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk