Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
I'm not a regular user of Highbury & Islington so I don't know
how long this has been going on. A (DC only) train drew in to platform 1 at approximately 15:15 today. After the driver and a few other people had changed ends it left. Platform 1 is the most southbound. If was the westbound NLL platform. As far as I can see it can only be used for terminating trains from the ELLE. Hopefully, they'll be running a service which the public can use before the official opening, much as they did with Dalston Junction. -- Roger |
#2
![]() |
|||
|
|||
![]()
"Roger" wrote in message
... I'm not a regular user of Highbury & Islington so I don't know how long this has been going on. A (DC only) train drew in to platform 1 at approximately 15:15 today. After the driver and a few other people had changed ends it left. Test trains were running during the first week in January. NRES online planner has the 8 tph service available from the 27th of this month. However posts in District Dave's forum predict an even earlier start than that, possibly on the 17th or 18th... Paul S |
#3
![]() |
|||
|
|||
![]()
On 04/02/2011 20:23, Paul Scott wrote:
"Roger" wrote in message ... I'm not a regular user of Highbury & Islington so I don't know how long this has been going on. A (DC only) train drew in to platform 1 at approximately 15:15 today. After the driver and a few other people had changed ends it left. Test trains were running during the first week in January. NRES online planner has the 8 tph service available from the 27th of this month. However posts in District Dave's forum predict an even earlier start than that, possibly on the 17th or 18th... Paul S Speaking of ELLE, I recently saw a train on the ELL with a pantograph in its coach. Are they now interchangeably running trains between ELL and NLL? |
#4
![]() |
|||
|
|||
![]()
wrote in message
... On 04/02/2011 20:23, Paul Scott wrote: "Roger" wrote in message ... I'm not a regular user of Highbury & Islington so I don't know how long this has been going on. A (DC only) train drew in to platform 1 at approximately 15:15 today. After the driver and a few other people had changed ends it left. Test trains were running during the first week in January. NRES online planner has the 8 tph service available from the 27th of this month. However posts in District Dave's forum predict an even earlier start than that, possibly on the 17th or 18th... Speaking of ELLE, I recently saw a train on the ELL with a pantograph in its coach. Are they now interchangeably running trains between ELL and NLL? The original order was for an ELL fleet of 20 DC units, presumably sized for Dalton Jn to the three current southern destinations, and an original 24 dual voltage units which was the number required for NLL, WLL & DC. All the subsequent extra units ordered variously for NLL/WLL extra services, ELL extension to Highbury and SLL to Clapham Jn have been dual voltage. However there have been one or two dual voltage units in use on the current ELL since it opened. This has probably allowed a slightly lower utilisation factor of the overall fleet, while there is a notional surplus of dual voltage units, because most of the extra NLL services are yet to start. The three dual voltage units ordered to support the SLL extension are of course yet to be delivered. In the final analysis there will be 20 DC units limited to the ELL and SLL, and 37 dual voltage units that can go anywhere. Paul S |
#5
![]() |
|||
|
|||
![]()
On Fri, 4 Feb 2011 20:23:28 -0000, "Paul Scott"
wrote: "Roger" wrote in message .. . I'm not a regular user of Highbury & Islington so I don't know how long this has been going on. A (DC only) train drew in to platform 1 at approximately 15:15 today. After the driver and a few other people had changed ends it left. Test trains were running during the first week in January. As well as not being a regular user of H&I I had a bereavement on 23rd December so wasn't very attentive at the beginning of January. NRES online planner has the 8 tph service available from the 27th of this month. However posts in District Dave's forum predict an even earlier start than that, possibly on the 17th or 18th... So, maybe only two or three weeks to wait. I'll keep my eyes open. A preview service would be good enough for me. -- Roger |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
East London Line extension to Highbury & Islington open today | London Transport | |||
Highbury and Islington Heat | London Transport | |||
Highbury and Islington Heat | London Transport | |||
Highbury and Islington Heat | London Transport | |||
Highbury and Islington Heat | London Transport |