![]() |
|
Baker St.(Met) and Met operations
"Don Davis" wrote in message ... wrote in message ... Do the platforms at Baker St. which are used by Met trains heading to/ from Aldgate ever get used for trains which terminate at Baker St.? Are all the Met platforms at Baker St. used fairly intensively or is there capacity for a train to be stabled out of use when defective or as a stand-by? Do trains stick to Aldgate or "non-Aldgate" services for most of the day or do they interwork between the two? What determines which diagrams will be allocated "A Stock" and which "S Stock"? Does the Chesham branch work better as a "through" service or should it have been left as a shuttle? When the Aldgate service was peak hours only in T stock days the through platforms were certainly used for the off peak terrminators.The station could not have coped otherwise. Not just T stock days. At least into the 1970s the entire Met Main Line service (Uxbridge, Watford and Amersham) terminated at Baker Street off-peak and weekends, using all four main line platforms at Baker Street. The decision has been taken that the Met stock will all be S8 when it's all been delivered. As this is too long for the Chalfont bay it will no longer be possible to run the Chesham service as a shuttle. If the Croxley Link gets built there may be a case for operating say a Chesham to Watford Junction service. Peter |
Baker St.(Met) and Met operations
On Oct 15, 8:04*pm, Paul Corfield wrote:
On Sat, 15 Oct 2011 07:26:35 -0700 (PDT), " wrote: Do the platforms at Baker St. which are used by Met trains heading to/ from Aldgate ever get used for trains which terminate at Baker St.? They can be used but I am not aware that they are routinely used. It is possible that an early morning or late evening working does reverse in those roads but it is not routine during the normal peak / off peak times of the day. Since the platforms were lengthened for S-stock last year, it is no longer possible to reverse in platform 3. Platform 2 remains available for reversing, but in practice is only so used in emergency. Stuart J |
Baker St.(Met) and Met operations
wrote True. I just wondered whether there had been any perceived diminution of reliability by Cheshamites used to a self-contained yo-yo-like operation not subject to the potential for delay which would be more prone to afflict the odd "through" journey and where the frequency is low enough to make reference to a timetable a more likely thing than many other parts of the LU network. I suspect that delays on through trains now have to be balanced against times when connections were broken at Chalfont to/from the shuttle. Peter |
Baker St.(Met) and Met operations
On Oct 15, 8:36*pm, "Peter Masson" wrote:
The decision has been taken that the Met stock will all be S8 when it's all been delivered. As this is too long for the Chalfont bay it will no longer be possible to run the Chesham service as a shuttle. If the Croxley Link gets built there may be a case for operating say a Chesham to Watford Junction service. I completely understand and agree with the decision to have a uniform S8 fleet...but I still don't buy the reasoning that it's more cost effective to complicate the service pattern, reduce the service to Amersham, pay for decommissioning the bay platform, and remove the 3- track section than to move the set of points closest to the bay and extend a concrete platform. ....here's hoping for the Croxley Link though... |
Baker St.(Met) and Met operations
"Peter Masson" wrote in message ... wrote True. I just wondered whether there had been any perceived diminution of reliability by Cheshamites used to a self-contained yo-yo-like operation not subject to the potential for delay which would be more prone to afflict the odd "through" journey and where the frequency is low enough to make reference to a timetable a more likely thing than many other parts of the LU network. I suspect that delays on through trains now have to be balanced against times when connections were broken at Chalfont to/from the shuttle. Peter tshanazt: No particular problems. The dodgiest periods have always been the rush-hours and they were through trains both sides of the change-over. Peter: That is what I meant by the greater difficulty in making claims. Miss the connection at Chalfont due to the late-running of the very tight connection off one of the Amersham services (always a dash!) and £11.00 was yours for the asking! |
Baker St.(Met) and Met operations
wrote in message ... Do the platforms at Baker St. which are used by Met trains heading to/ from Aldgate ever get used for trains which terminate at Baker St.? Are all the Met platforms at Baker St. used fairly intensively or is there capacity for a train to be stabled out of use when defective or as a stand-by? Do trains stick to Aldgate or "non-Aldgate" services for most of the day or do they interwork between the two? What determines which diagrams will be allocated "A Stock" and which "S Stock"? Does the Chesham branch work better as a "through" service or should it have been left as a shuttle? -- gordon At the moment the off peak services tend to be self contained. Amersham/Chesham fast services (four per hour) tend to terminate in the north bay at Baker St. The Watford services (six per hour) terminate in the bay south of the through lines. The Uxbridge services (six per hour) run through to Aldgate. From December the off peak timetable is being rewritten. From memory there will be eight trains per hour from Uxbridge and eight from Moor Park, the latter split into four from Watford, two from Amersham and two from Chesham. Some trains will run through to Aldgate (from all destinations) while others will terminate at Baker Street. There will also be inter working between routes. John |
Baker St.(Met) and Met operations
|
Baker St.(Met) and Met operations
On Oct 15, 9:17*pm, StuartJ wrote:
On Oct 15, 8:04*pm, Paul Corfield wrote: On Sat, 15 Oct 2011 07:26:35 -0700 (PDT), " wrote: Do the platforms at Baker St. which are used by Met trains heading to/ from Aldgate ever get used for trains which terminate at Baker St.? They can be used but I am not aware that they are routinely used. It is possible that an early morning or late evening working does reverse in those roads but it is not routine during the normal peak / off peak times of the day. Since the platforms were lengthened for S-stock last year, it is no longer possible to reverse in platform 3. Platform 2 remains available for reversing, but in practice is only so used in emergency. Although my understanding is that reversal in platform 3 will be recommissioned in the future, as part of the Sub Surface Lines resignalling. The relevant crossover will be moved to allow S-stock to reverse in the platform. |
Baker St.(Met) and Met operations
On Oct 16, 3:13*pm, Andy wrote:
On Oct 15, 9:17*pm, StuartJ wrote: On Oct 15, 8:04*pm, Paul Corfield wrote: On Sat, 15 Oct 2011 07:26:35 -0700 (PDT), " wrote: Do the platforms at Baker St. which are used by Met trains heading to/ from Aldgate ever get used for trains which terminate at Baker St.? They can be used but I am not aware that they are routinely used. It is possible that an early morning or late evening working does reverse in those roads but it is not routine during the normal peak / off peak times of the day. Since the platforms were lengthened for S-stock last year, it is no longer possible to reverse in platform 3. Platform 2 remains available for reversing, but in practice is only so used in emergency. Although my understanding is that reversal in platform 3 will be recommissioned in the future, as part of the Sub Surface Lines resignalling. The relevant crossover will be moved to allow S-stock to reverse in the platform. Glad to hear this- there must be a significant loss of flexibility at the moment. Stuart J |
All times are GMT. The time now is 09:49 AM. |
|
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk