![]() |
BML2/Crossrail Western Extensions.
On May 24, 9:29*pm, e27002 wrote:
Let's hope they put it in the right place, about 50% closer to Euston Road. *And we need a station on the Circle Line, either an enlarged and connected Euston Square, or a new one. ....and I would hope that if they did decide to move the SSL platforms in front of the NR station that they would rebuild them as a S8-length four-platform station to handle the increased dwell times London's HS2/ WCML terminus will surely cause. |
BML2/Crossrail Western Extensions.
On May 25, 9:00*am, Jamie Thompson wrote:
On May 24, 9:29*pm, e27002 wrote: Let's hope they put it in the right place, about 50% closer to Euston Road. *And we need a station on the Circle Line, either an enlarged and connected Euston Square, or a new one. ...and I would hope that if they did decide to move the SSL platforms in front of the NR station that they would rebuild them as a S8-length four-platform station to handle the increased dwell times London's HS2/ WCML terminus will surely cause. Good thinking. I like it. |
BML2/Crossrail Western Extensions.
On May 25, 9:39*pm, mark townend wrote:
On May 25, 9:18*pm, Jamie *Thompson wrote: On May 25, 12:53*pm, Neil Williams wrote: Jamie *Thompson wrote: ...and I would hope that if they did decide to move the SSL platforms in front of the NR station They already are. *The entrance is just in the wrong place. Not really. One end of them might well be, but if you put a tunnel in it'd be so ridiculously overloaded it'd be nigh on unusable. Really you need two passenger tunnels to the NR station, one on each end of the SSL platforms to prevent overloading them (see: Crossrail design principles). Extending the platforms eastwards by the equivalent of 3-4 car lengths would probably be enough to achieve this, and you could then wall up the current western end of the platforms as you'd only need S8 lengths and then use these as utility rooms or some such. So a new subway entrance from Euston mainline concourse connecting to the extended eastern end of the Met station and 'relief tunnels' at least partway alongside the platforms with additional cross-passage accesses to them. Perhaps the platforms could be widened instead to achieve a similar capacity. Are the existing platforms not full S8 length and if so do they operate using some sort of SDO system? It would probably mean a rebuild of Euston Square Station. But, it really is an omission not to have a Circle Line Station connected to Euston. It was also gross stupidity to rebuild Euston so far back from Euston Road. When Euston Square (Gower Street) was built the LNWR and Met. were competitors. They did not make interchange easy for their passengers. Today, Euston needs better access. Compare the number of Subway lines at Euston to the number serving Kings Cross/ Saint Pancras. |
BML2/Crossrail Western Extensions.
Let's hope they put it in the right place, about 50% closer to Euston Road. *And we need a station on the Circle Line, either an enlarged and connected Euston Square, or a new one. Again, this really isnt in any doubt - the combined WCML/HS2 station will be extended up to the Euston Road to allow for 400m platforms on the west side, and to make full use of the station footprint for existing services on the east side. Whether the existing Euston station would be rebuilt depends entirely on whether there's a business case to do so - hard to judge without knowing whether, and in what form, proposed lines such as Crossrail 2 and a DLR extension might take and their impact on Euston and the other lines that serve it. Chris |
BML2/Crossrail Western Extensions.
On Sat, 26 May 2012 02:07:31 -0700 (PDT), e27002
wrote: On May 25, 9:39*pm, mark townend wrote: On May 25, 9:18*pm, Jamie *Thompson wrote: On May 25, 12:53*pm, Neil Williams wrote: Jamie *Thompson wrote: ...and I would hope that if they did decide to move the SSL platforms in front of the NR station They already are. *The entrance is just in the wrong place. Not really. One end of them might well be, but if you put a tunnel in it'd be so ridiculously overloaded it'd be nigh on unusable. Really you need two passenger tunnels to the NR station, one on each end of the SSL platforms to prevent overloading them (see: Crossrail design principles). Extending the platforms eastwards by the equivalent of 3-4 car lengths would probably be enough to achieve this, and you could then wall up the current western end of the platforms as you'd only need S8 lengths and then use these as utility rooms or some such. So a new subway entrance from Euston mainline concourse connecting to the extended eastern end of the Met station and 'relief tunnels' at least partway alongside the platforms with additional cross-passage accesses to them. Perhaps the platforms could be widened instead to achieve a similar capacity. Are the existing platforms not full S8 length and if so do they operate using some sort of SDO system? It would probably mean a rebuild of Euston Square Station. But, it really is an omission not to have a Circle Line Station connected to Euston. It was also gross stupidity to rebuild Euston so far back from Euston Road. Look at a pre-1960s map. Euston station was rebuilt in the roughly the same place. When Euston Square (Gower Street) was built the LNWR and Met. were competitors. They did not make interchange easy for their passengers. Today, Euston needs better access. Compare the number of Subway lines at Euston to the number serving Kings Cross/ Saint Pancras. One subway under Euston Road and one under Pancras Road, n'est ce pas? |
BML2/Crossrail Western Extensions.
Whether the existing Euston station would be rebuilt depends entirely on whether there's a business case to do so - hard to judge without knowing whether, and in what form, proposed lines such as Crossrail 2 and a DLR extension might take and their impact on Euston and the other lines that serve it. Chris Sorry - that should read "Whether the existing Euston *Square* Met/ Circle/H&C station would be rebuilt..." |
BML2/Crossrail Western Extensions.
Last week, I (Mark Brader) wrote:
The distinction is meaningful because from 1933 until 1947, although London Transport had been forcibly unified and brought under public control, its ownership was still private. And Charles Ellson responded: There was no ownership, it was a statutary corporation. It was a statutory corporation, but it issued dividend-paying stock, and the owners of the previous private transport companies received shares of LPTB stock in place of their shares in their former companies. There were several classes of preference shares and then there were the ordinary or "C" shares, which were intended to pay 5% for the first 2 years and then 5.5½%. If this was not met over a three-year period, the stockholders had the right to put the corporation into receivership#. To me that adds up to ownership even if they didn't have the right to control the LPTB's actions. #-It wasn't, but they didn't. The full dividends on the preference shares were paid, but after that there was only enough to pay dividends of 3.5½%, 4%, 4%, 4¼%, 4%, and 1½% on C shares in the 6 years 1933-34 through 1938-39. The stockholders held a meeting but there was no consensus that a receiver was warranted. And then the war came and the government took control. See "A History of London Transport", vol. 2, chapters 15-16, and "Rails Through the Clay", 1993 edition, chapter 11. -- Mark Brader | "...it's always easier to see the mud when it's Toronto | coming toward your side rather than from your side." | --Mike Kruger My text in this article is in the public domain. |
BML2/Crossrail Western Extensions.
On May 29, 7:59*am, (Mark Brader) wrote:
Last week, I (Mark Brader) wrote: The distinction is meaningful because from 1933 until 1947, although London Transport had been forcibly unified and brought under public control, its ownership was still private. And Charles Ellson responded: There was no ownership, it was a statutary corporation. It was a statutory corporation, but it issued dividend-paying stock, and the owners of the previous private transport companies received shares of LPTB stock in place of their shares in their former companies. *There were several classes of preference shares and then there were the ordinary or "C" shares, which were intended to pay 5% for the first 2 years and then 5.5 %. *If this was not met over a three-year period, the stockholders had the right to put the corporation into receivership#. *To me that adds up to ownership even if they didn't have the right to control the LPTB's actions. #-It wasn't, but they didn't. *The full dividends on the preference shares were paid, but after that there was only enough to pay dividends of 3.5 %, 4%, 4%, 4 %, 4%, and 1 % on C shares in the 6 years 1933-34 through 1938-39. *The stockholders held a meeting but there was no consensus that a receiver was warranted. *And then the war came and the government took control. See "A History of London Transport", vol. 2, chapters 15-16, and "Rails Through the Clay", 1993 edition, chapter 11. Thank you, that was VERY informative. It filled a gap in my understanding of the LTPB. |
BML2/Crossrail Western Extensions.
On May 26, 6:49*pm, Charles Ellson wrote:
On Sat, 26 May 2012 02:07:31 -0700 (PDT), e27002 wrote: On May 25, 9:39*pm, mark townend wrote: On May 25, 9:18*pm, Jamie *Thompson wrote: On May 25, 12:53*pm, Neil Williams wrote: Jamie *Thompson wrote: ...and I would hope that if they did decide to move the SSL platforms in front of the NR station They already are. *The entrance is just in the wrong place. Not really. One end of them might well be, but if you put a tunnel in it'd be so ridiculously overloaded it'd be nigh on unusable. Really you need two passenger tunnels to the NR station, one on each end of the SSL platforms to prevent overloading them (see: Crossrail design principles). Extending the platforms eastwards by the equivalent of 3-4 car lengths would probably be enough to achieve this, and you could then wall up the current western end of the platforms as you'd only need S8 lengths and then use these as utility rooms or some such. So a new subway entrance from Euston mainline concourse connecting to the extended eastern end of the Met station and 'relief tunnels' at least partway alongside the platforms with additional cross-passage accesses to them. Perhaps the platforms could be widened instead to achieve a similar capacity. Are the existing platforms not full S8 length and if so do they operate using some sort of SDO system? It would probably mean a rebuild of Euston Square Station. *But, it really is an omission not to have a Circle Line Station connected to Euston. *It was also gross stupidity to rebuild Euston so far back from Euston Road. Look at a pre-1960s map. Euston station was rebuilt in the roughly the same place. It was actually extended something like 50 yards towards Euston Road. Drummond Street used to run right across the front of the old station. It was cut into two by the construction of the new station; what is now Doric Way (presumably named after the Doric portico which was demolished during the station rebuilding works) was formerly the eastern end of the same street. If I remember rightly, on one side of the station there's some kind of goods vehicle underpass that dives under the new station roughly on the line of the missing part of Drummond Street. Martin L |
BML2/Crossrail Western Extensions.
On Tue, 29 May 2012 06:52:08 -0700 (PDT), Martin L
wrote: On May 26, 6:49*pm, Charles Ellson wrote: On Sat, 26 May 2012 02:07:31 -0700 (PDT), e27002 wrote: On May 25, 9:39*pm, mark townend wrote: On May 25, 9:18*pm, Jamie *Thompson wrote: On May 25, 12:53*pm, Neil Williams wrote: Jamie *Thompson wrote: ...and I would hope that if they did decide to move the SSL platforms in front of the NR station They already are. *The entrance is just in the wrong place. Not really. One end of them might well be, but if you put a tunnel in it'd be so ridiculously overloaded it'd be nigh on unusable. Really you need two passenger tunnels to the NR station, one on each end of the SSL platforms to prevent overloading them (see: Crossrail design principles). Extending the platforms eastwards by the equivalent of 3-4 car lengths would probably be enough to achieve this, and you could then wall up the current western end of the platforms as you'd only need S8 lengths and then use these as utility rooms or some such. So a new subway entrance from Euston mainline concourse connecting to the extended eastern end of the Met station and 'relief tunnels' at least partway alongside the platforms with additional cross-passage accesses to them. Perhaps the platforms could be widened instead to achieve a similar capacity. Are the existing platforms not full S8 length and if so do they operate using some sort of SDO system? It would probably mean a rebuild of Euston Square Station. *But, it really is an omission not to have a Circle Line Station connected to Euston. *It was also gross stupidity to rebuild Euston so far back from Euston Road. Look at a pre-1960s map. Euston station was rebuilt in the roughly the same place. It was actually extended something like 50 yards towards Euston Road. Drummond Street used to run right across the front of the old station. Didn't the original cluster of buildings which formed the station go further south than the arch so that Drummond Street effectively ran through the station ? It was cut into two by the construction of the new station; what is now Doric Way (presumably named after the Doric portico which was demolished during the station rebuilding works) was formerly the eastern end of the same street. If I remember rightly, on one side of the station there's some kind of goods vehicle underpass that dives under the new station roughly on the line of the missing part of Drummond Street. Martin L |
All times are GMT. The time now is 07:44 AM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk