This is outside of London but as the Abbey flyer is discussed I am sure this
can be. The Government has just announced an additional £50 m on top of the £130 m already agreed. Ten years ago I was staggered at the £60 m estimate and now the project cost is £180 m. This can only be about a mile or railway, 2 stations and a viaduct. I don't think even HS2 is that much per mile and they will have to cost in the trains. Does anybody know why this project is so expensive? Kevin This week, the Government announced an extra £50million to take the Croxley Rail Link to its next phase. The funding is in addition to the £130million already committed to the project. The new funding was awarded after I met with officials in the Department for Transport, Communities Minister Greg Clark MP and TfL to make sure the project was kept on schedule. After campaigning in Parliament, I can now confirm that the rail link is completely financed and will move forward to the construction phase with work soon starting on the two new stations. The Croxley Rail Link is one of my key priorities for Watford and after decades of slow progress, I am delighted that it is finally to become a reality. The project will link Watford Junction to the Metropolitan Line, with new train stations being built at Vicarage Road and Ascot Road. This will improve access to Watford General Hospital, the football club, local business parks and thousands of homes. Watford Junction Redevelopment Campaign This week in Parliament, I called for the complete redevelopment of Watford Junction Station to become a priority for the Government and Network Rail. This will ensure the station is ready for increased passenger numbers and new services. Watford is a significant transport hub and we need the infrastructure to match this. Rail use has doubled in the last decade and with the Government investing so heavily in Watford transport by backing the Croxley Rail Link, this rise looks set to continue. We now need to look at what we can do to improve capacity at the stations as well as on the lines and this means completely redeveloping Watford Junction. The Station forecourt was re-designed less than two years ago, but has been plagued with problems with drop off and pick up of passengers, arrangements for taxis and pedestrian safety. I have pushed for these issues to be tackled as soon as possible, but feel a long-term plan for the station is needed. I am meeting with the Communities Minister, the Department of Transport, Network Rail and other key stakeholders to look at the redevelopment of the station. I hope to report back soon and would like to hear your views so please get in touch. Kind regards, Richard Harrington MP |
#2
![]() |
|||
|
|||
![]()
"Kevin" wrote:
This is outside of London but as the Abbey flyer is discussed I am sure this can be. The Government has just announced an additional £50 m on top of the £130 m already agreed. Ten years ago I was staggered at the £60 m estimate and now the project cost is £180 m. This can only be about a mile or railway, 2 stations and a viaduct. I don't think even HS2 is that much per mile and they will have to cost in the trains. Does anybody know why this project is so expensive? There may only be a mile or so of all-new railway, but altogether it's nearer to 3.5 miles, including the reopened section and two new stations. But, yes, it does sound like a lot for what is really quite a simple project. Maybe it wouldn't have taken so long to get approval had it been more affordable? Obviously some of the cost will be for upgrading the DC line that's shared with the Overground, including work at the existing High St and Junction stations. |
#3
![]() |
|||
|
|||
![]()
2 stations and a viaduct.
Two viaducts or major bridges. No provision appears to have been made for reinstatement when Ascot Road was build. |
#4
![]() |
|||
|
|||
![]()
"Recliner" wrote in message
... "Kevin" wrote: This is outside of London but as the Abbey flyer is discussed I am sure this can be. The Government has just announced an additional £50 m on top of the £130 m already agreed. Ten years ago I was staggered at the £60 m estimate and now the project cost is £180 m. This can only be about a mile or railway, 2 stations and a viaduct. I don't think even HS2 is that much per mile and they will have to cost in the trains. Does anybody know why this project is so expensive? There may only be a mile or so of all-new railway, but altogether it's nearer to 3.5 miles, including the reopened section and two new stations. But, yes, it does sound like a lot for what is really quite a simple project. Maybe it wouldn't have taken so long to get approval had it been more affordable? Obviously some of the cost will be for upgrading the DC line that's shared with the Overground, including work at the existing High St and Junction stations. According to this the new Lea Bridge station will cost £6.5 million. Lets be generous and say the 2 new stations will £15 million. That will put re-instating the line, the viaduct, upgrading High St to Watford Junc at £165 million. I also understand that Watford Met will be retained as sidings so add a junction with the deviation. Anybody know how long phase 1 of the East London Line was and that came in at £1 billion. Something doesn't add up in my mind. Kevin |
#5
![]() |
|||
|
|||
![]()
"Kevin" wrote:
"Recliner" wrote in message ... "Kevin" wrote: This is outside of London but as the Abbey flyer is discussed I am sure this can be. The Government has just announced an additional £50 m on top of the £130 m already agreed. Ten years ago I was staggered at the £60 m estimate and now the project cost is £180 m. This can only be about a mile or railway, 2 stations and a viaduct. I don't think even HS2 is that much per mile and they will have to cost in the trains. Does anybody know why this project is so expensive? There may only be a mile or so of all-new railway, but altogether it's nearer to 3.5 miles, including the reopened section and two new stations. But, yes, it does sound like a lot for what is really quite a simple project. Maybe it wouldn't have taken so long to get approval had it been more affordable? Obviously some of the cost will be for upgrading the DC line that's shared with the Overground, including work at the existing High St and Junction stations. According to this the new Lea Bridge station will cost £6.5 million. Lets be generous and say the 2 new stations will £15 million. That will put re-instating the line, the viaduct, upgrading High St to Watford Junc at £165 million. I also understand that Watford Met will be retained as sidings so add a junction with the deviation. Anybody know how long phase 1 of the East London Line was and that came in at £1 billion. Something doesn't add up in my mind. Please could you use a proper newsreader, so your comments don't get mixed with the ones you're responding to? The Lea Bridge station is a reopening, using the existing platforms. A better comparison might be the all-new station at Southend Airport, which cost £16m in 2011. Allowing for inflation, the new stations for 8-car trains might cost £20m apiece, plus a few million each to upgrade two existing stations, so the stations probably account for ~£50m. As for the line, the new non-electrified Bacon Factory chord cost £59 for a 1.2km line, while the 2km, electrified single track Hitchin flyover cost £47m. By those standards, building the new 4.5km Croxley line, and upgrading the shared DC line to Watford Junction could be expected to cost upwards of £100m. According to table 3.2 in this document http://www.croxleyraillink.com/media...n%20report.pdf The works are described as: • 4.5km of new railway track, signalling and structures; • 0.4km embankment and viaduct over Watford Road, Grand Union Canal and River Gade linking the Metropolitan Line and the Croxley Green Branch; • New stations at Ascot Road and Watford General Hospital; • Refurbishment of station at Watford High Street; • Refurbishment of Cardiff Road, Ascot Road and River Colne underbridges; and • Maintenance of Tolpits Lane, Vicarage Road and Wiggenhall Road overbridges. - Construction and engineering costs: £133m - Land, additional vehicles, public enquiry: £19.1m - Risk allowance: £19.9m - TOTAL £172m |
#6
![]() |
|||
|
|||
![]()
On 2014\07\11 21:53, Recliner wrote:
the new non-electrified Bacon Factory chord cost £59 for a 1.2km line Bargain! |
#7
![]() |
|||
|
|||
![]()
Basil Jet wrote:
On 2014\07\11 21:53, Recliner wrote: the new non-electrified Bacon Factory chord cost £59 for a 1.2km line Bargain! Oops! Bells prices, of course. |
#8
![]() |
|||
|
|||
![]() According to this the new Lea Bridge station will cost £6.5 million. The Lea Bridge station is a reopening, using the existing platforms. A better comparison might be the all-new station at Southend Airport, which cost £16m in 2011. These prices are insane. How could reinstating Lea Bridge station on land which is presumably still owned by the railway cost as much as buying 14 average London houses and the land they stand on? Southend Airport station is quite nice with its enclosed footbridge and lifts on both sides, but how could it cost as much as 78 average Southend houses and the land they stand on? Somebody is getting very rich here, and I bet it isn't the men with bricks in their hands. |
#9
![]() |
|||
|
|||
![]()
Basil Jet wrote:
According to this the new Lea Bridge station will cost £6.5 million. The Lea Bridge station is a reopening, using the existing platforms. A better comparison might be the all-new station at Southend Airport, which cost £16m in 2011. These prices are insane. How could reinstating Lea Bridge station on land which is presumably still owned by the railway cost as much as buying 14 average London houses and the land they stand on? Southend Airport station is quite nice with its enclosed footbridge and lifts on both sides, but how could it cost as much as 78 average Southend houses and the land they stand on? Somebody is getting very rich here, and I bet it isn't the men with bricks in their hands. Yes, I know, these prices are astonishing, if routine these days. It's why NR brought in modular stations, and Chiiltern decided to build Warwick Parkway itself, for much less than NR said it would cost: "The managing director of Chiltern Trains, on BBC's Panorama, had asked Network Rail to quote for a new station for Warwick Parkway. Network Rail said it would cost £13 million. The managing director thought this was a lot of money. He went to the train companies and the station was built for £5.5 million." From: http://www.exeterexpressandecho.co.u...#ixzz37EvFsA00 I don't know if TfL is any more efficient at building new stations than NR. I think one aspect that's particularly expensive in this country is to build new stations on in-service lines, so the two all-new stations on the Croxley line should be cheaper than they would be if the line were already in use. |
#10
![]() |
|||
|
|||
![]()
These prices are insane. How could reinstating Lea Bridge station on
land which is presumably still owned by the railway cost as much as buying 14 average London houses and the land they stand on? Perhaps start by costing in the passenger lifts? Adding them to an old station can easily cost around a million with ancillary works included. -- Robin reply to address is (meant to be) valid |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Croxley Rail Link - Position Update October 2007 | London Transport | |||
Croxley Rail Link Petition | London Transport | |||
CROXLEY RAIL LINK - POSITION UPDATE - February 2007 | London Transport | |||
Future is bleak for Croxley Rail Link | London Transport | |||
No funding for Croxley link | London Transport |